To: All Members
From: Pease Development Authority, Airport Management Department
Date:
I.
Date Held:
III. Chairperson: Andrew Pomeroy, PDA-Airport
IV. Members Present: Harold Shaw, TSA
Beth Demaine, PDA-Airport
Hazel Baribeault, NHANG
Richard Peatfield, ATCS
Brian Corliss, TSA
Amber Goodspeed, PDA-Airport
V.
The following items were discussed or actions proposed or taken as indicated:
A. Expected FBO traffic (especially Part 139):
1.
2. Pan Am Services (PAS): PAS
will be handling corporate traffic this week.
B. NHANG HHQ Operations:
Aircraft Arrival Departure
KC-10 26 Oct @
C. CY06 Construction:
1.
2.
General
Aviation Apron Reconstruction/ Taxiway A OFA: The lines on November have been painted. This week the contractor will have to grind
and repave to eliminate areas of ponding created in the initial construction. Phase
6 has begun outside the fence with prep work for the apron extension. A T-Hangar tenant/Contractor meeting will be
scheduled in order to go over issues from this project so far. T-Hangar tenants
and owners will receive an email or posted invitation to this meeting which
will also be attended by Pike, Pike’s insurance representative, HTA, and
representatives of Pease Development Authority. The meeting will be held at 360
Corporate Drive in the evening at a date yet to be determined. The project will
be continued in the spring of 2007.
The
Taxiway A OFA project is currently in the final phase with some minor punch
list items remaining. Some items have been added to this project including hold
lines, new markings and signage on both ends in order to meet FAA requirements,
and possibly runway and sensor scan systems. These additional items will
probably not be completed until spring.
3. Sound Insulation Project: Construction
on 2 of the 10 structures in Phase 2 has begun and should be completed by Thanksgiving.
Work will be done simultaneously on many structures. Phase 3 homes have been
identified and designed and are currently awaiting funding approval. The third
phase should go out to bid in early 2007.
5. FMQ-19: The FMQ-19 weather equipment has
been installed but a glitch on the resistance on the grounding grid was
discovered. The grounding issue may be resolved within the next few days. A new part is also on order and is expected
to arrive in the same timeframe. The FMQ-19 is automatic sensing device on the
airfield and the information will be sent to the weather observer to be
validated and released. Once the project is completed the weather observers
will be moved to the ATC tower. There will be a phone line in addition to the
ATIS, but the information provided there will not be “official.”
D. Airport
Maintenance: Airfield maintenance will
include preventative maintenance on lighting and other projects in preparation
for the winter season. They will continue painting.
E. Wildlife: A flock of
geese were chased off the airfield this week by an operations agent.
F. Security: The threat level remains at
A Security Directive was also issued requiring Airport Operations and Security Agents to conduct
random checks and inspections of vehicles in the secured area.
There
will also be a change in badging procedures, particularly regarding
escorts. Additional information will be
made available at a later date.
Please
continue to challenge and be observant and report anything suspicious to
Airport Operations. Ground Vehicle Procedures training classes will continue to
be held in the Airport Management Conference Room,
Security and Ground Vehicle Procedures
Class Schedule:
Oct
31 Security @
Nov 7 Security @
G.
Other: The annual FAA certification inspection will take place November 13-15th. Invitations will go out for the 9AM Nov 13th
in-brief and the out-brief on November 15th. The
H. Meetings: (All meetings are open to the public unless otherwise noted.)
1.
The 2006-7 Snow
Meeting will be held on
2.
The next PDA Board
of Directors Meeting will be held
3.
The next Quarterly
Security Meeting will be held Thursday,
4.
The next Noise
Compatibility Committee Meeting will be held Thursday,
5.
The next Quarterly
Wildlife Meeting will be held
Tuesday , 1/23/07 @ 1:00PM in the Airport Management Conference Room,
immediately followed by a 2007 Upland Sandpipers and Mowing Management
Meeting.
6.
The next Users
Group Meeting will be held in March 2007 (date to be determined) at the new
ARFF Station.